CCTEG General Contracting - Lanzhou Coal Water Slurry Factory 01 Aug 2018

The first coal water slurry plant built in northwest China

Design annual production capacity: The total design scale is 1.5 million tons/year, of which the first phase project is 500,000 tons/year.
Outstanding technical features:This project is an environmental protection project supported and promoted by Lanzhou Environmental Protection Bureau and relevant departments. The design adopts the mature high-concentration coal-water slurry preparation process and equipment. The system setting is perfect and reasonable, and the product indicators meet the design requirements. With the construction of follow-up projects, it will become the largest coal-water slurry production base in the northwest and will play a positive role in suppressing air pollution in Lanzhou.

    Sections

  1. Case Demonstrations
  2. Solutions

    Popular

Contact Us

凯发娱乐

百度360搜索搜狗搜索